4 goats or 6 sheep can graze a field in 50 days
4 goats or 6 sheep can graze a field in 50 days. 2 goats and 9 sheep can graze a field in
- 100 days
- 75 days
- 50 days
- 25 days
Answer
1 day's work or efficiency of 4 goats = 1/50 = 2%
So, efficiency of 1 goat = 2/4 % = 0.5%
Similarly efficiency of 1 sheep = 2/6 % = 1/3%
Therefore efficiency of 2 goats and 9 sheep = 2×(0.5 %) + 9×(1/3 %) = 1% + 3% = 4%
So, time taken = 100 / 4 = 25 days
The correct option is D.